“closed to vehicular traffic”
This is the fifth bridge to be located at this site. The first bridge was a crude open timber bridge, according to Town Records. Most sources credit the construction of the current bridge to Jacob Berry. The sides of the Whittier Bridge were originally closed with the exception of tiny windows. The sides were opened as part of a 1982 restoration. The bridge was closed to vehicular traffic on March 15, 1989.
Be the first to add a review to the Whittier Bridge.
Whittier Bridge
Hours
Problem with this listing? Let us know.
Has RV parking changed? Let us know.
-
Parking
-
Pets Allowed
-
Restrooms
-
Wifi
-
Wheelchair Accessible
-
Credit Cards Accepted
Nearby Hotels
Related Trip Guides
The Great Northern is a 3,600 mile, cross-country odyssey
- 57 Places
- 69:15
- 3,565 mi
The top things to do on an I-95 road trip
- 50 Places
- 41:46
- 1,983 mi